Commercial outdoor furniture manufacturerOEM / ODM · Hotels · Resorts · Contractors
MIDDLE EAST · GCC REGION

5-Star Beachfront Resort Pool Deck Deployment

400-key property with complete marine-grade outdoor furniture package — delivered and installed within a strict 12-week peak season preparation window.

Client Anonymous Resort Developer
Project Type Full Pool Deck Redeployment
Delivery Window 12 Weeks
Total Pieces 512 Units
Material Spec Marine-Grade Aluminum

PROJECT STORY

Challenge · Solution · Outcome

⚠️

The Challenge

The property required full furniture replacement during peak season preparation window, with strict salt-spray performance requirements for coastal location. Existing furniture showed corrosion within 18 months. Custom brand color matching was mandatory across all pieces.

  • 12-week strict delivery deadline
  • Coastal salt-spray environment
  • Custom brand color match required
  • 512 pieces to manufacture & deliver

Our Solution

Marine-grade aluminum frames with 1200-hour salt spray certification. Custom powder coat finish matched to brand standards. Phased production and delivery to enable staged installation without disrupting guest areas. All hardware 316-grade stainless steel.

  • 1200-hour salt spray certified aluminum
  • Custom RAL powder coat color match
  • Phased production & delivery schedule
  • 316-grade stainless steel hardware
🏆

Project Outcome

All units delivered and installed within the 12-week window, ready for peak tourist season. The 3-year corrosion-free performance has been verified in actual coastal conditions. Guest satisfaction scores for pool area improved 22% post-installation.

  • 100% on-time delivery and installation
  • 3-year corrosion-free performance verified
  • Perfect brand color consistency achieved
  • 22% improvement in guest satisfaction

SCOPE OF SUPPLY

Complete Product Breakdown

Product Category Quantity Model / Series Specification
Commercial Sun Loungers 420 units Marine Series ML-700 Adjustable backrest, quick-dry cushions
Daybed Cabanas 48 units Resort Collection RC-220 With canopy system, side privacy panels
Poolside Side Tables 24 units Marine Series MT-100 Compact design, weather-resistant surface
Installation Hardware Full package 316 Stainless Steel All brackets, bolts, and leveling feet
Winter Storage Covers 512 units Commercial Grade UV-stabilized, breathable fabric

MATERIALS SPECIFICATION

Premium Construction Standards

🔩

Frame Construction

Marine-grade aluminum, 2.0mm wall thickness, fully welded construction for maximum structural integrity in coastal environments.

🎨

Powder Coat Finish

1200-hour salt spray tested, custom RAL color matched to client brand standards, multi-stage pretreatment process.

🧵

Fabric System

Solution-dyed acrylic upholstery with 5-year fade warranty, mold and mildew resistant treatment for tropical humidity.

🛋️

Cushion System

Commercial-grade high-density quick-dry foam with breathable mesh base, preventing water retention and mildew growth.

PROCUREMENT TIMELINE

12-Week Project Schedule

1

Week 1-2

Finalize specifications, color matching approval, production planning and material sourcing.

2

Week 3-8

Full production with weekly photo updates, quality control checks at every manufacturing stage.

3

Week 9

Final quality inspection, container loading, preparation for sea freight to destination port.

4

Week 10-11

Sea freight transport, customs clearance coordination, on-site installation team preparation.

5

Week 12

Final delivery to site, installation supervision, handover training, and client sign-off.

🔒

Anonymous Project Reference

This case represents an actual delivered commercial project. Client identity and exact location are protected under confidentiality agreement. All specifications, metrics and outcomes are factual. Contact us for reference verification process and additional project details that can be shared within the bounds of our confidentiality agreements.